We had a setback in the completion of Cabinet installation. The installer broke his toe Thursday night after he was here so he didn't come back until today. But he worked on it all day and got them finished. We're missing some trim and he'll have to come back after the floor is done to do the floor trim.
The cabinets beside the pantry. Microwave goes on top and oven underneath. Cabinets above have dividers for cooking sheets and flat pans.
Island from the side where the overhang will be. The granite will overhand 12 inches and we'll have barstools to sit at here.
Island from the other side where the cook top and the second oven will be
Island from the end where the small sink will be.
It's amazing how different the room is from just a couple of months ago! We're hoping the granite guys can come out tomorrow to do their templates. Plumber will be here Thursday to run the gas and water lines to the bar. Herbie has been working on the crown molding and has about got it done. Still have a lot to do but this is a huge step!
No comments:
Post a Comment